Skip to domain reports

Domain Security Reports

Search tracked domains and review stored evidence, detections, and the latest observed availability.

222,440
Total Tracked
216,617
VT Detected
92,828
Last Seen Active
129,612
Unavailable at Last Check
Filtered by Registrar: Cloudflare 21,965 results Clear filters
Cloudflare

Cloudflare 🇺🇸

🇺🇸 United States Founded 2009 IANA #1910 cloudflare.com
21,965
Phishing Domains
7,096
Still Alive
14,867
Taken Down
93.9%
Detection Rate
8.5
Avg VT Score
32.3%
Alive Rate
21,965 phishing-domain abuse reports sent: Cloudflare
PhishDestroy sends one primary abuse report for every phishing domain entered in its threat database. This page contains 21,965 domains registered through Cloudflare, so the primary report total is 21,965. Database coverage starts Jul 19, 2025. 32% of these reported domains remain active, suggesting inadequate enforcement of abuse policies.
93.9% of domains flagged by VirusTotal 14,346 domains with VT ≥ 5
Tracking since Jul 2025 — latest: Oct 17, 2026
15/100
Global Risk Score — Moderate
Based on 342M domains analyzed across 4,154 registrars
Full Analysis
3,797,134
Global Domains
33.2%
1-Year Reg
56.4%
Active IPs

Cloudflare, Inc. has a low risk score of 15/100, indicating a generally clean registrar profile. Notably, 64.5% of domains are older than one year, which suggests stability and a lower likelihood of abuse.

Cloudflare, Inc. 21,965 domains
ledgerdrainer.pages.dev
1 VTActiveLedger
Screenshot of ledgerfox-web.pages.dev
ledgerfox-web.pages.dev
1 VTActiveacross
Screenshot of ledgerfox-web.pages.dev
ledgerfox-web.pages.dev
Screenshot of ledgerlive-app-run.pages.dev
ledgerlive-app-run.pages.dev
1 VTUnknownacross
Screenshot of ledgerlive-app-run.pages.dev
ledgerlive-app-run.pages.dev
Screenshot of ledgerlive-dsktop.pages.dev
ledgerlive-dsktop.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlive-dsktop.pages.dev
ledgerlive-dsktop.pages.dev
ledgerlive-wallet.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlivean.pages.dev
ledgerlivean.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlivean.pages.dev
ledgerlivean.pages.dev
Screenshot of ledgerlivewalle.pages.dev
ledgerlivewalle.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlivewalle.pages.dev
ledgerlivewalle.pages.dev
Screenshot of ledgerlivewallet-aeu.pages.dev
ledgerlivewallet-aeu.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlivewallet-aeu.pages.dev
ledgerlivewallet-aeu.pages.dev
Screenshot of ledgerlogn-us.pages.dev
ledgerlogn-us.pages.dev
1 VTUnknownLedger
Screenshot of ledgerlogn-us.pages.dev
ledgerlogn-us.pages.dev
Screenshot of ledgerr-comstart-eng.pages.dev
ledgerr-comstart-eng.pages.dev
1 VTActiveLedger
Screenshot of ledgerr-comstart-eng.pages.dev
ledgerr-comstart-eng.pages.dev
Screenshot of ledgers-livoxx-eng.pages.dev
ledgers-livoxx-eng.pages.dev
1 VTUnknownLedger
Screenshot of ledgers-livoxx-eng.pages.dev
ledgers-livoxx-eng.pages.dev
Screenshot of ledgersnow.com
ledgersnow.com
1 VTUnknownLedger
Screenshot of ledgersnow.com
ledgersnow.com
Screenshot of ledgger-io-live.pages.dev
ledgger-io-live.pages.dev
1 VTUnknownLedger
Screenshot of ledgger-io-live.pages.dev
ledgger-io-live.pages.dev
Screenshot of ledgr-apps.pages.dev
ledgr-apps.pages.dev
1 VTUnknownLedger
Screenshot of ledgr-apps.pages.dev
ledgr-apps.pages.dev
ledgr-liive-app.pages.dev
1 VTUnknownLedger
Screenshot of ledgr-live-wallen.pages.dev
ledgr-live-wallen.pages.dev
1 VTUnknown
Screenshot of ledgr-live-wallen.pages.dev
ledgr-live-wallen.pages.dev
Screenshot of ledgr-walet-en.pages.dev
ledgr-walet-en.pages.dev
1 VTUnknownLedger
Screenshot of ledgr-walet-en.pages.dev
ledgr-walet-en.pages.dev
Screenshot of ledgreus-org.pages.dev
ledgreus-org.pages.dev
1 VTUnknownLedger
Screenshot of ledgreus-org.pages.dev
ledgreus-org.pages.dev
Screenshot of ledgrr-us-livee-en.pages.dev
ledgrr-us-livee-en.pages.dev
1 VTUnknownLedger
Screenshot of ledgrr-us-livee-en.pages.dev
ledgrr-us-livee-en.pages.dev
Screenshot of ledgrrrr---live---walllettt.pages.dev
ledgrrrr---live---walllettt.pages.dev
1 VTUnknownLedger
Screenshot of ledgrrrr---live---walllettt.pages.dev
ledgrrrr---live---walllettt.pages.dev
Screenshot of ledzr-com-strt-io.pages.dev
ledzr-com-strt-io.pages.dev
1 VTUnknownLedger
Screenshot of ledzr-com-strt-io.pages.dev
ledzr-com-strt-io.pages.dev
Screenshot of leezengsolana-fun.pages.dev
leezengsolana-fun.pages.dev
1 VTActiveSolana DrainerSolana
Screenshot of leezengsolana-fun.pages.dev
leezengsolana-fun.pages.dev
Screenshot of leger-desktop-app.pages.dev
leger-desktop-app.pages.dev
1 VTUnknownLedger
Screenshot of leger-desktop-app.pages.dev
leger-desktop-app.pages.dev
Screenshot of leger-livedesktop-click.pages.dev
leger-livedesktop-click.pages.dev
1 VTUnknownLedger
Screenshot of leger-livedesktop-click.pages.dev
leger-livedesktop-click.pages.dev
Screenshot of leger-web-app.pages.dev
leger-web-app.pages.dev
1 VTUnknownLedger
Screenshot of leger-web-app.pages.dev
leger-web-app.pages.dev
Screenshot of legion-apple-valley-mn.pages.dev
legion-apple-valley-mn.pages.dev
1 VTActiveApple
Screenshot of legion-apple-valley-mn.pages.dev
legion-apple-valley-mn.pages.dev
Screenshot of legion-cc.pages.dev
legion-cc.pages.dev
1 VTUnknowndiscord
Screenshot of legion-cc.pages.dev
legion-cc.pages.dev
Screenshot of lejr-live-desktop-help.pages.dev
lejr-live-desktop-help.pages.dev
1 VTUnknownLedger
Screenshot of lejr-live-desktop-help.pages.dev
lejr-live-desktop-help.pages.dev
Screenshot of leowallet.pages.dev
leowallet.pages.dev
1 VTActivegoogle
Screenshot of leowallet.pages.dev
leowallet.pages.dev
Screenshot of leve-ledgr.pages.dev
leve-ledgr.pages.dev
1 VTUnknownLedger
Screenshot of leve-ledgr.pages.dev
leve-ledgr.pages.dev
Screenshot of lezoliveus.pages.dev
lezoliveus.pages.dev
1 VTUnknownLedger
Screenshot of lezoliveus.pages.dev
lezoliveus.pages.dev
Screenshot of lichen-network-dex.pages.dev
lichen-network-dex.pages.dev
1 VTActivebase
Screenshot of lichen-network-dex.pages.dev
lichen-network-dex.pages.dev
Screenshot of lidgterstringvalidate.pages.dev
lidgterstringvalidate.pages.dev
1 VTActive
Screenshot of lidgterstringvalidate.pages.dev
lidgterstringvalidate.pages.dev
Screenshot of lidia-kitchen.pages.dev
lidia-kitchen.pages.dev
1 VTActiveGoogle
Screenshot of lidia-kitchen.pages.dev
lidia-kitchen.pages.dev
Screenshot of linea-6kt.pages.dev
linea-6kt.pages.dev
1 VTUnknown["linea"]
Screenshot of linea-6kt.pages.dev
linea-6kt.pages.dev
Screenshot of linkhoki-10.pages.dev
linkhoki-10.pages.dev
1 VTUnknown
Screenshot of linkhoki-10.pages.dev
linkhoki-10.pages.dev
Screenshot of links.megamp.workers.dev
links.megamp.workers.dev
1 VTActiveUnknown
Screenshot of links.megamp.workers.dev
links.megamp.workers.dev
Screenshot of linktron25.worker-bbb847f2.workers.dev
linktron25.worker-bbb847f2.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron25.worker-bbb847f2.workers.dev
linktron25.worker-bbb847f2.workers.dev
Screenshot of linktron26.worker-bbb847f2.workers.dev
linktron26.worker-bbb847f2.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron26.worker-bbb847f2.workers.dev
linktron26.worker-bbb847f2.workers.dev
Screenshot of linktron31.worker-1d051cb0.workers.dev
linktron31.worker-1d051cb0.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron31.worker-1d051cb0.workers.dev
linktron31.worker-1d051cb0.workers.dev
Screenshot of linktron34.worker-783a6710.workers.dev
linktron34.worker-783a6710.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron34.worker-783a6710.workers.dev
linktron34.worker-783a6710.workers.dev
Screenshot of linktron60.worker-4fc736d3.workers.dev
linktron60.worker-4fc736d3.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron60.worker-4fc736d3.workers.dev
linktron60.worker-4fc736d3.workers.dev
Screenshot of linktron62.worker-1d051cb0.workers.dev
linktron62.worker-1d051cb0.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron62.worker-1d051cb0.workers.dev
linktron62.worker-1d051cb0.workers.dev
Screenshot of linktron64.worker-ef3f16fe.workers.dev
linktron64.worker-ef3f16fe.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron64.worker-ef3f16fe.workers.dev
linktron64.worker-ef3f16fe.workers.dev
Screenshot of linktron84.worker-6ffadacf.workers.dev
linktron84.worker-6ffadacf.workers.dev
1 VTTaken DownUnknown
Screenshot of linktron84.worker-6ffadacf.workers.dev
linktron84.worker-6ffadacf.workers.dev
Screenshot of little-feather-d960.awqer-667.workers.dev
little-feather-d960.awqer-667.workers.dev
1 VTActivetelegram
Screenshot of little-feather-d960.awqer-667.workers.dev
little-feather-d960.awqer-667.workers.dev
Screenshot of little-mode-4179.adgde.workers.dev
little-mode-4179.adgde.workers.dev
1 VTActivetelegram
Screenshot of little-mode-4179.adgde.workers.dev
little-mode-4179.adgde.workers.dev
Screenshot of littlepepeweb.pages.dev
littlepepeweb.pages.dev
1 VTActiveethereum
Screenshot of littlepepeweb.pages.dev
littlepepeweb.pages.dev
Screenshot of live-en-us-download.pages.dev
live-en-us-download.pages.dev
1 VTUnknownLedger
Screenshot of live-en-us-download.pages.dev
live-en-us-download.pages.dev
Screenshot of live-ioledgr.pages.dev
live-ioledgr.pages.dev
1 VTUnknownLedger
Screenshot of live-ioledgr.pages.dev
live-ioledgr.pages.dev
Screenshot of live-ldge-eng.pages.dev
live-ldge-eng.pages.dev
1 VTUnknown
Screenshot of live-ldge-eng.pages.dev
live-ldge-eng.pages.dev
Screenshot of live-ldger-org-x.pages.dev
live-ldger-org-x.pages.dev
1 VTUnknownLedger
Screenshot of live-ldger-org-x.pages.dev
live-ldger-org-x.pages.dev
Screenshot of live-led-gr.pages.dev
live-led-gr.pages.dev
1 VTUnknownledger
Screenshot of live-led-gr.pages.dev
live-led-gr.pages.dev
Screenshot of live-ledge-app-eng-dim.pages.dev
live-ledge-app-eng-dim.pages.dev
1 VTUnknownLedger
Screenshot of live-ledge-app-eng-dim.pages.dev
live-ledge-app-eng-dim.pages.dev
Screenshot of live-ledge-learns.pages.dev
live-ledge-learns.pages.dev
1 VTUnknownLedger
Screenshot of live-ledge-learns.pages.dev
live-ledge-learns.pages.dev
Screenshot of live-ledgrr-en-us.pages.dev
live-ledgrr-en-us.pages.dev
1 VTUnknownLedger
Screenshot of live-ledgrr-en-us.pages.dev
live-ledgrr-en-us.pages.dev
Screenshot of lleddger-live.pages.dev
lleddger-live.pages.dev
1 VTUnknownLedger
Screenshot of lleddger-live.pages.dev
lleddger-live.pages.dev
loanxxxx7736721.lovable.app
1 VTActiveGoogle
Screenshot of localedger-com.pages.dev
localedger-com.pages.dev
1 VTActiveLedger
Screenshot of localedger-com.pages.dev
localedger-com.pages.dev
Screenshot of lockzone100.pages.dev
lockzone100.pages.dev
1 VTUnknown
Screenshot of lockzone100.pages.dev
lockzone100.pages.dev
Screenshot of lofai-connect.pages.dev
lofai-connect.pages.dev
1 VTActiveinstagram
Screenshot of lofai-connect.pages.dev
lofai-connect.pages.dev
Screenshot of logenn-treez-io-hardware.pages.dev
logenn-treez-io-hardware.pages.dev
1 VTActivefoundation
Screenshot of logenn-treez-io-hardware.pages.dev
logenn-treez-io-hardware.pages.dev
Screenshot of logenn-treez-ioi.pages.dev
logenn-treez-ioi.pages.dev
1 VTUnknownTrezor
Screenshot of logenn-treez-ioi.pages.dev
logenn-treez-ioi.pages.dev
Screenshot of logincblinea.pages.dev
logincblinea.pages.dev
1 VTUnknownLinea
Screenshot of logincblinea.pages.dev
logincblinea.pages.dev
loginxyz.pages.dev
1 VTUnknownEthereum
Screenshot of logn-treezr-en.pages.dev
logn-treezr-en.pages.dev
1 VTUnknownTrezor
Screenshot of logn-treezr-en.pages.dev
logn-treezr-en.pages.dev
Screenshot of logsvideos.pages.dev
logsvideos.pages.dev
1 VTUnknown
Screenshot of logsvideos.pages.dev
logsvideos.pages.dev
Screenshot of lp-tokenfi-com.pages.dev
lp-tokenfi-com.pages.dev
1 VTActiveacross
Screenshot of lp-tokenfi-com.pages.dev
lp-tokenfi-com.pages.dev
Screenshot of luna-solana-fun.pages.dev
luna-solana-fun.pages.dev
1 VTActiveSolana Drainerdextools
Screenshot of luna-solana-fun.pages.dev
luna-solana-fun.pages.dev
luxehauls.com
1 VTActiveGoogle
Screenshot of lxp.pages.dev
lxp.pages.dev
1 VTUnknownLinea
Screenshot of lxp.pages.dev
lxp.pages.dev
Screenshot of m-syrup-fi.pages.dev
m-syrup-fi.pages.dev
1 VTActive
Screenshot of m-syrup-fi.pages.dev
m-syrup-fi.pages.dev
Screenshot of m-worldlibertyfinancial.pages.dev
m-worldlibertyfinancial.pages.dev
1 VTUnknowngenericcloudflare
Screenshot of m-worldlibertyfinancial.pages.dev
m-worldlibertyfinancial.pages.dev
Screenshot of machine-setup.pages.dev
machine-setup.pages.dev
1 VTUnknowncoinbase
Screenshot of machine-setup.pages.dev
machine-setup.pages.dev
Screenshot of madsraffle.live
madsraffle.live
1 VTUnknowntwitter
Screenshot of madsraffle.live
madsraffle.live
Screenshot of maga-mem-pages-dev.pages.dev
maga-mem-pages-dev.pages.dev
1 VTUnknowngenericcrypto
Screenshot of maga-mem-pages-dev.pages.dev
maga-mem-pages-dev.pages.dev
Screenshot of magacoins-finance.pages.dev
magacoins-finance.pages.dev
1 VTActivecoingecko
Screenshot of magacoins-finance.pages.dev
magacoins-finance.pages.dev
magic-polygon.pages.dev
1 VTActivePolygon
Screenshot of main-1of.pages.dev
main-1of.pages.dev
1 VTActiveLedger
Screenshot of main-1of.pages.dev
main-1of.pages.dev
Screenshot of mainnet-42y.pages.dev
mainnet-42y.pages.dev
1 VTUnknown
Screenshot of mainnet-42y.pages.dev
mainnet-42y.pages.dev
Screenshot of mainnetblock.pages.dev
mainnetblock.pages.dev
1 VTUnknownacross
Screenshot of mainnetblock.pages.dev
mainnetblock.pages.dev
Screenshot of mainnets-protocol.pages.dev
mainnets-protocol.pages.dev
1 VTUnknowngenericcloudflare
Screenshot of mainnets-protocol.pages.dev
mainnets-protocol.pages.dev
Screenshot of maiv-whitelist.pages.dev
maiv-whitelist.pages.dev
1 VTUnknowngenericcloudflare
Screenshot of maiv-whitelist.pages.dev
maiv-whitelist.pages.dev
Screenshot of manekiairdrop.pages.dev
manekiairdrop.pages.dev
1 VTActiveledger
Screenshot of manekiairdrop.pages.dev
manekiairdrop.pages.dev
Screenshot of manta-bridge-org-github-io.pages.dev
manta-bridge-org-github-io.pages.dev
1 VTActiveManta
Screenshot of manta-bridge-org-github-io.pages.dev
manta-bridge-org-github-io.pages.dev
Screenshot of mapool-org.pages.dev
mapool-org.pages.dev
1 VTActive
Screenshot of mapool-org.pages.dev
mapool-org.pages.dev
Screenshot of mars-airdropclaim.pages.dev
mars-airdropclaim.pages.dev
1 VTUnknownacross
Screenshot of mars-airdropclaim.pages.dev
mars-airdropclaim.pages.dev
Screenshot of mashalaump.pages.dev
mashalaump.pages.dev
1 VTUnknownUniswap
Screenshot of mashalaump.pages.dev
mashalaump.pages.dev
Screenshot of math-de6.pages.dev
math-de6.pages.dev
1 VTActive
Screenshot of math-de6.pages.dev
math-de6.pages.dev
math-is-fun.pages.dev
1 VTUnknown
mathemask.gotrackier.com
1 VTActiveUnknown
Screenshot of mayocalc.pages.dev
mayocalc.pages.dev
1 VTActivecompound
Screenshot of mayocalc.pages.dev
mayocalc.pages.dev
Screenshot of mcmodupdate.pages.dev
mcmodupdate.pages.dev
1 VTActiveminecraft
Screenshot of mcmodupdate.pages.dev
mcmodupdate.pages.dev
Screenshot of meal-wallet.pages.dev
meal-wallet.pages.dev
1 VTUnknown
Screenshot of meal-wallet.pages.dev
meal-wallet.pages.dev
Screenshot of medcall-5a6.pages.dev
medcall-5a6.pages.dev
1 VTActiveSui
Screenshot of medcall-5a6.pages.dev
medcall-5a6.pages.dev
Screenshot of meerae-net.pages.dev
meerae-net.pages.dev
1 VTActivecosmos
Screenshot of meerae-net.pages.dev
meerae-net.pages.dev
Screenshot of megadrop-bouncebit.pages.dev
megadrop-bouncebit.pages.dev
1 VTUnknown
Screenshot of megadrop-bouncebit.pages.dev
megadrop-bouncebit.pages.dev
Screenshot of melaniameme-6m3.pages.dev
melaniameme-6m3.pages.dev
1 VTActiveavalanche
Screenshot of melaniameme-6m3.pages.dev
melaniameme-6m3.pages.dev
Screenshot of mellstroywin.casino
mellstroywin.casino
1 VTUnknowntelegram
Screenshot of mellstroywin.casino
mellstroywin.casino
memedsolutions.com
1 VTActiveceler
« Prev 197 198 199 200 201 202 203 Next » Page 200 of 220

Browse by Registrar

Select a registrar to see all flagged domains registered through them.

Showing 21,965 domains above

Browse by Drainer Type

Wallet drainer kits detected on phishing domains.

Browse by Scam Kit

Common scam campaign types detected by page title analysis.

Browse by Target Brand

Legitimate brands being impersonated by phishing sites.

Browse by Scam Type

Classification of phishing campaigns by attack methodology and social engineering technique.

Threat Response Pipeline

How every domain in this hub is verified and how confirmed threats are neutralized. Full pipeline visualization →

Threat Intelligence Checks— every domain is scanned & cross-checked against:
Global Vendor Sync— confirmed detections are pushed to 29 partners: