evm-claimrr[.]netlify[.]app
evm-claimrr.netlify.app — Chưa được xác minh. Tóm tắt bằng chứng: VirusTotal 2/91 (alphaMountain.ai, Gridinsoft); URLScan capture; 1 external blocklist match (ScamSniffer); PhishDestroy score 63/100. Nhà đăng ký: Netlify.
Phân tích chi tiết của PhishDestroy AI bên dưới được giữ bằng tiếng Anh để bảo toàn hồ sơ pháp chứng gốc.
evm-claimrr.netlify.app is a tenant hostname on Netlify, not a separately registered domain. PhishDestroy first observed the hostname on Aug 28, 2026. Current evidence score: 63/100 (high).
Positive findings are stored from 2 sources: VirusTotal and ScamSniffer. VirusTotal recorded 2 detections among 91 engines: alphaMountain.ai, Gridinsoft on Aug 28, 2026 at 13:10 UTC. ScamSniffer listed the hostname in the separate external-blocklist snapshot on Aug 28, 2026 at 14:20 UTC. Non-positive and contextual checks: ScamAdviser assigned a trust score of 15/100 (Very Likely Unsafe); no observation timestamp was retained. Google Safe Browsing returned no flag on Aug 28, 2026 at 15:09 UTC. URLScan captured the page on Aug 28, 2026 at 13:03 UTC.
The collector marked the hostname reachable on Aug 28, 2026 at 13:03 UTC, but did not retain the HTTP response code. Netlify is the hosting platform for this tenant, not its registrar. At collection time, the hostname resolved to 35.157.26.135 on AS16509 (Amazon.com, Inc.). The IP and ASN identify shared Netlify infrastructure, not the tenant operator. The evidence archive retains 2 visual captures from PhishDestroy and URLScan; no page title was retained, so the captures preserve the landing-page appearance. The platform TLS certificate was issued by DigiCert Inc.
The record contains 2 positive source findings supporting the current phishing classification. The stored fields do not identify an impersonated brand or victim interaction.
Pipeline ứng phó với các mối đe dọa
Trạng thái trong danh sách chặn công khai
Công nghệ · 4 identified
Bootstrap is a free and open-source CSS framework directed at responsive, mobile-first front-end web development. It contains CSS and JavaScript-based design templates for typography, forms, buttons, navigation, and other interface components.
getbootstrap.com Độ tin cậy 100%React is an open-source JavaScript library for building user interfaces or UI components.
reactjs.org Độ tin cậy 100%Netlify providers hosting and server-less backend services for web applications and static websites.
www.netlify.com Độ tin cậy 100%HTTP Strict Transport Security (HSTS) informs browsers that the site should only be accessed using HTTPS.
www.rfc-editor.org Độ tin cậy 100%Phân tích của VirusTotal
Phân tích hiệu suất trang
Google PageSpeed Insights — mobile performance audit of evm-claimrr.netlify.app · checked Aug 28, 2026
Bằng chứng và các báo cáo bên ngoài
Bạn có bị ảnh hưởng bởi trang web này không?
Nếu bạn đã nhập thông tin xác thực tài khoản, thông tin cá nhân hoặc thông tin thanh toán hoặc đã tải xuống tệp từ miền này, hãy hành động ngay lập tức. Dưới đây là các nguồn lực giúp bạn báo cáo vụ việc và bảo vệ chính mình.
Hãy báo cáo với chính quyền địa phương
Chọn quốc gia của bạn để nhận liên hệ tội phạm mạng chính thức hoặc soạn thảo đơn khiếu nại →.
Kiểm tra bất kỳ tên miền nào
Phân tích mối đe dọa bằng cách sử dụng danh sách chặn được lưu trữ, WHOIS, DNS và bằng chứng quét công khai
Quét ngayBáo cáo lừa đảo qua email
Hãy gửi các tên miền đáng ngờ đến cơ sở dữ liệu mối đe dọa của chúng tôi — để bảo vệ cộng đồng
Báo cáoDòng tin tức về các mối đe dọa thời gian thực
Các báo cáo lừa đảo gần đây và những thay đổi về tính khả dụng được quan sát thấy
Theo dõiLuôn cập nhật thông tin, luôn an toàn
Theo dõi các mối đe dọa đang diễn ra hoặc phản đối danh sách này nếu bạn cho rằng đây là kết quả báo động sai