Domain Security Reports

Search our database of flagged domains. Check if a website is a scam, phishing, or legitimate.

0
Total Tracked
0
Detected
0
Content Alive
0
Content Dead
0
VT Pending
Wallet Connect Abuse

Wallet Connect Abuse Protocol Abuse Low Activity

Active since 2023 walletconnect.com (legit site) 1,672 domains tracked
Exploits the WalletConnect protocol to trick users into signing malicious transactions. Phishing sites impersonate legitimate dApps and request wallet connections to drain funds.
1,672
Total Domains
99
Still Alive
1,501
Taken Down
93.1%
Detection Rate
6.9
Avg VT Score
5.9%
Alive Rate
5.9% of domains still active 882 domains with VT ≥ 5
Tracking since Mar 2024 — latest: May 30, 2026
Wallet Connect Abuse 1,672 domains
Screenshot of degengames.fun
degengames.fun
2 VTUnknownchase
Screenshot of degengames.fun
degengames.fun
Screenshot of drop-lifeai.org
drop-lifeai.org
2 VTUnknownavalanche
Screenshot of drop-lifeai.org
drop-lifeai.org
Screenshot of edel-airdrop.com
edel-airdrop.com
2 VTUnknownWalletConnect
Screenshot of edel-airdrop.com
edel-airdrop.com
Screenshot of eligibility-edel.com
eligibility-edel.com
2 VTUnknownWalletConnect
Screenshot of eligibility-edel.com
eligibility-edel.com
Screenshot of esqresso.foundation
esqresso.foundation
2 VTUnknown
Screenshot of esqresso.foundation
esqresso.foundation
Screenshot of evm.onchainwalletcrypto.com
evm.onchainwalletcrypto.com
2 VTUnknownCrypto.com
Screenshot of evm.onchainwalletcrypto.com
evm.onchainwalletcrypto.com
Screenshot of fastwallet.trade
fastwallet.trade
2 VTUnknownWalletConnect
Screenshot of fastwallet.trade
fastwallet.trade
Screenshot of findyourtoken.cx
findyourtoken.cx
2 VTUnknownacross
Screenshot of findyourtoken.cx
findyourtoken.cx
Screenshot of fineturtle.com
fineturtle.com
2 VTParkedWalletConnect
Screenshot of fineturtle.com
fineturtle.com
Screenshot of fir10.209494.com
fir10.209494.com
2 VTUnknownfoundation
Screenshot of fir10.209494.com
fir10.209494.com
Screenshot of funnydex.com
funnydex.com
2 VTUnknownBinance
Screenshot of funnydex.com
funnydex.com
Screenshot of fushenprotocol.xyz
fushenprotocol.xyz
2 VTUnknownArbitrum
Screenshot of fushenprotocol.xyz
fushenprotocol.xyz
Screenshot of gasspas-vip.web.app
gasspas-vip.web.app
2 VTUnknownWalletConnect
Screenshot of gasspas-vip.web.app
gasspas-vip.web.app
Screenshot of gasspas-vips.web.app
gasspas-vips.web.app
2 VTLivegoogle
Screenshot of gasspas-vips.web.app
gasspas-vips.web.app
Screenshot of ghodefi.top
ghodefi.top
2 VTUnknownAave
Screenshot of ghodefi.top
ghodefi.top
Screenshot of gokabuto.org
gokabuto.org
2 VTUnknownAirdrop Scam
Screenshot of gokabuto.org
gokabuto.org
Screenshot of governance-uniswap.com
governance-uniswap.com
2 VTUnknownUniswap
Screenshot of governance-uniswap.com
governance-uniswap.com
Screenshot of grokdextools.site
grokdextools.site
2 VTUnknownavalanche
Screenshot of grokdextools.site
grokdextools.site
Screenshot of hepyrlandfenence.org
hepyrlandfenence.org
2 VTUnknownacross
Screenshot of hepyrlandfenence.org
hepyrlandfenence.org
Screenshot of heyanon-ai-interface-git-feature-zodiac-widget-real-wagmi.vercel.app
heyanon-ai-interface-git-feature-zodiac-widget-real-wagmi.vercel.app
2 VTLiveacross
Screenshot of heyanon-ai-interface-git-feature-zodiac-widget-real-wagmi.vercel.app
heyanon-ai-interface-git-feature-zodiac-widget-real-wagmi.vercel.app
Screenshot of hilltonscreener.com
hilltonscreener.com
2 VTUnknown
Screenshot of hilltonscreener.com
hilltonscreener.com
Screenshot of honeycomb.0xhoneyjar.xyz
honeycomb.0xhoneyjar.xyz
2 VTUnknownacross
Screenshot of honeycomb.0xhoneyjar.xyz
honeycomb.0xhoneyjar.xyz
Screenshot of horizon-dapp.web.app
horizon-dapp.web.app
2 VTLiveaerodrome
Screenshot of horizon-dapp.web.app
horizon-dapp.web.app
Screenshot of houdiniswsp.com
houdiniswsp.com
2 VTUnknowncoinmarketcap
Screenshot of houdiniswsp.com
houdiniswsp.com
Screenshot of hybrafinance.com
hybrafinance.com
2 VTUnknown
Screenshot of hybrafinance.com
hybrafinance.com
Screenshot of hyperkp.com
hyperkp.com
2 VTUnknownWalletConnect
Screenshot of hyperkp.com
hyperkp.com
Screenshot of hyperliquid.com-portal-connects-secure-prod.pro
hyperliquid.com-portal-connects-secure-prod.pro
2 VTUnknowncoinbase
Screenshot of hyperliquid.com-portal-connects-secure-prod.pro
hyperliquid.com-portal-connects-secure-prod.pro
Screenshot of ipp.finance
ipp.finance
2 VTUnknownbinance
Screenshot of ipp.finance
ipp.finance
Screenshot of ipypb.cc
ipypb.cc
2 VTUnknown
Screenshot of ipypb.cc
ipypb.cc
Screenshot of isldata.cc
isldata.cc
2 VTUnknownWalletConnect
Screenshot of isldata.cc
isldata.cc
Screenshot of ito.wechain.ai
ito.wechain.ai
2 VTUnknowntelegram
Screenshot of ito.wechain.ai
ito.wechain.ai
Screenshot of j-dex-v4.app
j-dex-v4.app
2 VTUnknowndiscord
Screenshot of j-dex-v4.app
j-dex-v4.app
Screenshot of kiberswap.com
kiberswap.com
2 VTUnknown
Screenshot of kiberswap.com
kiberswap.com
Screenshot of kinetiq-foundations.org
kinetiq-foundations.org
2 VTUnknowndiscord
Screenshot of kinetiq-foundations.org
kinetiq-foundations.org
Screenshot of leotec.app
leotec.app
2 VTUnknown
Screenshot of leotec.app
leotec.app
Screenshot of libertywsap.finance
libertywsap.finance
2 VTUnknownaave
Screenshot of libertywsap.finance
libertywsap.finance
Screenshot of libretyswap.finance
libretyswap.finance
2 VTUnknownbase
Screenshot of libretyswap.finance
libretyswap.finance
Screenshot of liquild.xyz
liquild.xyz
2 VTUnknownfoundation
Screenshot of liquild.xyz
liquild.xyz
Screenshot of live-humanity.org
live-humanity.org
2 VTUnknownacross
Screenshot of live-humanity.org
live-humanity.org
Screenshot of live-stable.org
live-stable.org
2 VTCF Bannedacross
Screenshot of live-stable.org
live-stable.org
Screenshot of lunexnetwork.com
lunexnetwork.com
2 VTUnknownrevolut
Screenshot of lunexnetwork.com
lunexnetwork.com
Screenshot of lxlwyn.top
lxlwyn.top
2 VTUnknown
Screenshot of lxlwyn.top
lxlwyn.top
Screenshot of malenerosenberghansen.com
malenerosenberghansen.com
2 VTUnknownWalletConnect
Screenshot of malenerosenberghansen.com
malenerosenberghansen.com
mamorewards.com
2 VTUnknownWalletConnect
Screenshot of manyushiba.xyz
manyushiba.xyz
2 VTUnknownWalletConnect
Screenshot of manyushiba.xyz
manyushiba.xyz
Screenshot of mascor.info
mascor.info
2 VTUnknownAptos
Screenshot of mascor.info
mascor.info
Screenshot of mask-eligibility.app
mask-eligibility.app
2 VTUnknownacross
Screenshot of mask-eligibility.app
mask-eligibility.app
Screenshot of memepartyoneth.xyz
memepartyoneth.xyz
2 VTUnknownrevolut
Screenshot of memepartyoneth.xyz
memepartyoneth.xyz
Screenshot of migrate-yieldbasic.com
migrate-yieldbasic.com
2 VTUnknown
Screenshot of migrate-yieldbasic.com
migrate-yieldbasic.com
Screenshot of moon015.szcca.net
moon015.szcca.net
2 VTUnknown
Screenshot of moon015.szcca.net
moon015.szcca.net
Screenshot of moon048.94tp.com
moon048.94tp.com
2 VTUnknownBitcoin
Screenshot of moon048.94tp.com
moon048.94tp.com
Screenshot of multichainpump.fun
multichainpump.fun
2 VTUnknownPump.fun
Screenshot of multichainpump.fun
multichainpump.fun
Screenshot of mysterybox.gam3s.claims
mysterybox.gam3s.claims
2 VTUnknown
Screenshot of mysterybox.gam3s.claims
mysterybox.gam3s.claims
Screenshot of nlrwvf.pages.dev
nlrwvf.pages.dev
2 VTLive
Screenshot of nlrwvf.pages.dev
nlrwvf.pages.dev
Screenshot of nnvtz-uqaaa-aaaah-qpuuq-cai.icp0.io
nnvtz-uqaaa-aaaah-qpuuq-cai.icp0.io
2 VTUnknown
Screenshot of nnvtz-uqaaa-aaaah-qpuuq-cai.icp0.io
nnvtz-uqaaa-aaaah-qpuuq-cai.icp0.io
Screenshot of o4xfd-oiaaa-aaaaj-qnsaa-cai.icp0.io
o4xfd-oiaaa-aaaaj-qnsaa-cai.icp0.io
2 VTUnknownEthereum
Screenshot of o4xfd-oiaaa-aaaaj-qnsaa-cai.icp0.io
o4xfd-oiaaa-aaaaj-qnsaa-cai.icp0.io
Screenshot of oguser.pages.dev
oguser.pages.dev
2 VTLiveEthereum
Screenshot of oguser.pages.dev
oguser.pages.dev
Screenshot of okxclaim.web.app
okxclaim.web.app
2 VTUnknownOKX
Screenshot of okxclaim.web.app
okxclaim.web.app
Screenshot of online232.com
online232.com
2 VTUnknowntrust wallet
Screenshot of online232.com
online232.com
Screenshot of onyx-token.com
onyx-token.com
2 VTUnknownLedger
Screenshot of onyx-token.com
onyx-token.com
Screenshot of originndefi.org
originndefi.org
2 VTUnknown
Screenshot of originndefi.org
originndefi.org
Screenshot of origndefi.org
origndefi.org
2 VTUnknown
Screenshot of origndefi.org
origndefi.org
Screenshot of pad-chain-gpt.org
pad-chain-gpt.org
2 VTUnknownceler
Screenshot of pad-chain-gpt.org
pad-chain-gpt.org
Screenshot of panther-guard.web.app
panther-guard.web.app
2 VTUnknownWalletConnect
Screenshot of panther-guard.web.app
panther-guard.web.app
Screenshot of pape-drops.netlify.app
pape-drops.netlify.app
2 VTUnknownWalletConnect
Screenshot of pape-drops.netlify.app
pape-drops.netlify.app
Screenshot of pck-wallet-v1.app
pck-wallet-v1.app
2 VTUnknownacross
Screenshot of pck-wallet-v1.app
pck-wallet-v1.app
Screenshot of peipeicoins-ai.firebaseapp.com
peipeicoins-ai.firebaseapp.com
2 VTLivecoingecko
Screenshot of peipeicoins-ai.firebaseapp.com
peipeicoins-ai.firebaseapp.com
Screenshot of pepeclaim2.net
pepeclaim2.net
2 VTUnknownsolana
Screenshot of pepeclaim2.net
pepeclaim2.net
Screenshot of peperider.com
peperider.com
2 VTUnknownEthereum
Screenshot of peperider.com
peperider.com
Screenshot of pepusunchained-portal.com
pepusunchained-portal.com
2 VTUnknownWalletConnect
Screenshot of pepusunchained-portal.com
pepusunchained-portal.com
Screenshot of phase3-stable.com
phase3-stable.com
2 VTUnknownceler
Screenshot of phase3-stable.com
phase3-stable.com
Screenshot of pol10.com
pol10.com
2 VTUnknownWalletConnect
Screenshot of pol10.com
pol10.com
Screenshot of polbot55.vip
polbot55.vip
2 VTUnknownWalletConnect
Screenshot of polbot55.vip
polbot55.vip
Screenshot of polbot77.vip
polbot77.vip
2 VTUnknownWalletConnect
Screenshot of polbot77.vip
polbot77.vip
Screenshot of portal-campnetwork.web.app
portal-campnetwork.web.app
2 VTLiveWalletConnect
Screenshot of portal-campnetwork.web.app
portal-campnetwork.web.app
Screenshot of pqlzd-baaaa-aaaai-aqfja-cai.icp0.io
pqlzd-baaaa-aaaai-aqfja-cai.icp0.io
2 VTUnknownWalletConnect
Screenshot of pqlzd-baaaa-aaaai-aqfja-cai.icp0.io
pqlzd-baaaa-aaaai-aqfja-cai.icp0.io
Screenshot of pro700.vip
pro700.vip
2 VTUnknowntrust wallet
Screenshot of pro700.vip
pro700.vip
Screenshot of pth997.com
pth997.com
2 VTUnknowntrust wallet
Screenshot of pth997.com
pth997.com
Screenshot of pub-159584f62dcf45f09d67c8485f215d9a.r2.dev
pub-159584f62dcf45f09d67c8485f215d9a.r2.dev
2 VTUnknown1inch
Screenshot of pub-159584f62dcf45f09d67c8485f215d9a.r2.dev
pub-159584f62dcf45f09d67c8485f215d9a.r2.dev
Screenshot of pumpfun.pump-airdrop.cfd
pumpfun.pump-airdrop.cfd
2 VTUnknown1inch
Screenshot of pumpfun.pump-airdrop.cfd
pumpfun.pump-airdrop.cfd
Screenshot of punksauction-votes.com
punksauction-votes.com
2 VTParkedWalletConnect
Screenshot of punksauction-votes.com
punksauction-votes.com
Screenshot of quickswap-exchange-dapp.com
quickswap-exchange-dapp.com
2 VTUnknownacross
Screenshot of quickswap-exchange-dapp.com
quickswap-exchange-dapp.com
Screenshot of raydium.website
raydium.website
2 VTUnknownRaydium
Screenshot of raydium.website
raydium.website
Screenshot of reavers-booty.web.app
reavers-booty.web.app
2 VTUnknownAave
Screenshot of reavers-booty.web.app
reavers-booty.web.app
Screenshot of register-humidifi.org
register-humidifi.org
2 VTUnknownacross
Screenshot of register-humidifi.org
register-humidifi.org
Screenshot of register-pancakeswap.xyz
register-pancakeswap.xyz
2 VTUnknownPancakeSwap
Screenshot of register-pancakeswap.xyz
register-pancakeswap.xyz
Screenshot of revoke-veloedrome.com
revoke-veloedrome.com
2 VTUnknowngoogle
Screenshot of revoke-veloedrome.com
revoke-veloedrome.com
Screenshot of revoking-aereodrome.com
revoking-aereodrome.com
2 VTUnknowngoogle
Screenshot of revoking-aereodrome.com
revoking-aereodrome.com
Screenshot of reward-ofc.org
reward-ofc.org
2 VTUnknownWalletConnect
Screenshot of reward-ofc.org
reward-ofc.org
Screenshot of rewards-mio.com
rewards-mio.com
2 VTUnknowngoogle
Screenshot of rewards-mio.com
rewards-mio.com
Screenshot of rewards-soracles.com
rewards-soracles.com
2 VTUnknowngoogle
Screenshot of rewards-soracles.com
rewards-soracles.com
Screenshot of rewardshyper.com
rewardshyper.com
2 VTUnknownWalletConnect
Screenshot of rewardshyper.com
rewardshyper.com
Screenshot of ruji.trade
ruji.trade
2 VTUnknownchatgpt
Screenshot of ruji.trade
ruji.trade
Screenshot of scope.rocketlauncher.gg
scope.rocketlauncher.gg
2 VTUnknownacross
Screenshot of scope.rocketlauncher.gg
scope.rocketlauncher.gg
Screenshot of signup-pepes.com
signup-pepes.com
2 VTUnknown
Screenshot of signup-pepes.com
signup-pepes.com
Screenshot of signup-sends.info
signup-sends.info
2 VTUnknown
Screenshot of signup-sends.info
signup-sends.info
Screenshot of solanaairdrop.icu
solanaairdrop.icu
2 VTUnknownSolana
Screenshot of solanaairdrop.icu
solanaairdrop.icu
Screenshot of spacepay.live
spacepay.live
2 VTUnknownscroll
Screenshot of spacepay.live
spacepay.live
Screenshot of squid-bridge.com
squid-bridge.com
2 VTUnknownacross
Screenshot of squid-bridge.com
squid-bridge.com
Screenshot of stake.vianxy.online
stake.vianxy.online
2 VTUnknowndiscord
Screenshot of stake.vianxy.online
stake.vianxy.online
« Prev 10 11 12 13 14 15 16 Next » Page 13 of 17

Browse by Registrar

Select a registrar to see all flagged domains registered through them.

NiceNIC International ... 25,002 Cloudflare, Inc. 20,176 GoDaddy.com, LLC 8,325 PDR Ltd. d/b/a PublicD... 7,407 DYNADOT LLC 7,160 Gname.com Pte. Ltd. 5,712 NameCheap, Inc. 5,173 NameSilo, LLC 5,128 Web Commerce Communica... 4,100 Tucows Domains Inc. 3,580 Global Domain Group LLC 3,450 Fewmoretaps OU d/b/a T... 3,227 HOSTINGER operations, UAB 2,930 MarkMonitor, Inc. 1,977 Dominet (HK) Limited 1,850 OwnRegistrar, Inc. 1,733 Vercel Inc. 1,589 Dynadot Inc 1,529 GitHub, Inc. 1,522 Cloudflare Pages 1,518 CSC Corporate Domains,... 1,502 MAT BAO CORPORATION 1,420 REGRU-RU 1,303 Key-Systems GmbH 1,296 Hosting Concepts B.V. ... 1,190 Spaceship, Inc. 1,165 Webflow 1,064 Hello Internet Corp 1,030 Porkbun LLC 983 Name.com, Inc. 862

Browse by Drainer Type

Wallet drainer kits detected on phishing domains.

Angel Drainer 4,389 Solana Drainer 2,217 Wallet Connect Abuse 1,672 Inferno Drainer 43 Ice Phishing 42 wallet_drainer 19 Unknown Drainer 8 known_drainer_kit 1 MS Drainer 1 Pink Drainer 1 Venom Drainer 1

Showing 1,672 domains above

Browse by Scam Kit

Common scam campaign types detected by page title analysis.

Gambler Scam 3,854 Airdrop Scam 498 Token Presale 94 Giveaway Scam 24 Recovery Scam 10 Verification Scam 6 Staking Scam 4 NFT Mint 3

Browse by Target Brand

Legitimate brands being impersonated by phishing sites.

Crypto Casino / Gambling 6,158 Ledger 6,047 across 5,166 Coinbase 3,766 Google 2,654 Solana 2,626 ethereum 2,416 Airdrop Scam 2,410 Kraken 2,390 gmail 2,237 MetaMask 2,072 Base 2,066 Binance 2,028 Trezor 1,980 OKX 1,790 Aave 1,558 x.com 1,360 Facebook 1,243 Trust Wallet 1,129 SushiSwap 1,062

Browse by Scam Type

Classification of phishing campaigns by attack methodology and social engineering technique.

AML Scam 1,843 Seed Phrase Theft 18 Airdrop Scam 6,146 Investment Scam 200