Notification and current-status evidence
The sent-report ledger records the first outgoing report at .
The recorded recipient is abuse@dynadot.com.
The latest stored availability evidence still shows the domain reachable; 9 days has elapsed since the first outgoing report.
ICANN RAA §3.18 describes registrar abuse-contact and handling obligations. This section records outgoing timestamps, listed recipients, case identifiers, and later availability. It does not by itself prove receipt, acknowledgement, investigation, remediation, or contractual non-compliance.
asteroid-evm[.]airdrops-xc[.]lol
asteroid-evm.airdrops-xc.lol — Non verificato. Simulazione del marchio: Airdrop Scam; Tipo di truffa: Airdrop Scam. Riepilogo delle prove: VirusTotal 1/91 (SOCRadar); PhishDestroy score 81/100. Registrar: DYNADOT.
L’analisi dettagliata di PhishDestroy AI resta in inglese per preservare il rapporto forense originale.
asteroid-evm.airdrops-xc.lol is a subdomain of airdrops-xc.lol. PhishDestroy first observed the hostname on Aug 8, 2026. Stored content metadata identifies Airdrop Scam as the apparent target. Stored page analysis classifies the content as airdrop scam. Current evidence score: 81/100 (critical).
One source contains a positive finding: VirusTotal. VirusTotal recorded 1 detections among 91 engines: SOCRadar on Aug 17, 2026 at 04:01 UTC. Non-positive and contextual checks: The separate external-blocklist snapshot contained no matches on Aug 17, 2026 at 06:20 UTC. URLQuery recorded no positive detection on Aug 8, 2026 at 07:27 UTC. Google Safe Browsing returned no flag on Aug 17, 2026 at 04:01 UTC. URLScan completed without a malicious verdict (score 0) on Aug 9, 2026 at 10:48 UTC.
The collector marked the hostname reachable on Aug 9, 2026 at 22:13 UTC, but did not retain the HTTP response code. Registration records for the registrable domain airdrops-xc.lol list DYNADOT LLC as the registrar and Aug 8, 2026 as the creation date. Registration and first observation occurred on the same UTC date. At collection time, the hostname resolved to 188.114.96.3 on AS13335 (CLOUDFLARENET - Cloudflare, Inc., US). The IP and ASN identify shared Cloudflare edge infrastructure; the origin server is not established by this address. DOM analysis on Aug 8, 2026 at 10:20 UTC returned 81/100. The evidence archive retains 4 visual captures from PhishDestroy, URLScan, URLQuery, and Cloudflare Radar; no page title was retained, so the captures preserve the landing-page appearance. TLS metadata lists Google Trust Services / WE1 as the certificate issuer with validity through Nov 6, 2026; checked Aug 8, 2026 at 10:02 UTC.
Stored content provides classification context, but only one source contains a positive finding.
Informazioni sulla sicurezza di rete
Pipeline di risposta alle minacce
Stato della lista di blocco pubblica
Acquisizione salvata
Analisi dei domini
Dettagli tecniciDNS, SAN SSL, timestamp
ICANN OVERSIGHT
Registration: airdrops-xc.lol
Accreditamento e contesto RAA
Accreditamento e contesto RAA
Registrar accreditation and DNS abuse obligations
For the registrable domain airdrops-xc.lol behind this subdomain, the registrar above operates under an ICANN accreditation agreement. The links below provide the official fee schedule and current DNS abuse compliance guidance.
Accreditation is a contract, not a safety certification.
RAA §3.18 establishes abuse-contact and handling requirements. This report can document stored outbound notices and later technical observations; it does not by itself establish receipt, investigation, remediation, or contractual non-compliance.
Tecnologie · 3 identified
Cloudflare Browser Insights is a tool that measures the performance of websites from the perspective of users.
www.cloudflare.com Confidenza al 100%Cloudflare is a web-infrastructure and website-security company, providing content-delivery-network services, DDoS mitigation, Internet security, and distributed domain-name-server services.
www.cloudflare.com Confidenza al 100%HTTP/3 is the third major version of the Hypertext Transfer Protocol used to exchange information on the World Wide Web.
httpwg.org Confidenza al 100%Analisi di VirusTotal
Prove archiviate
Analisi delle prestazioni del sito
Google PageSpeed Insights — mobile performance audit of asteroid-evm.airdrops-xc.lol · checked Aug 8, 2026
Dati e relazioni esterne
PD-20260808-77AC2C Recipient: abuse@dynadot.com Questo sito ti ha influenzato in qualche modo?
Se hai inserito credenziali dell'account, informazioni personali o di pagamento oppure hai scaricato un file da questo dominio, agisci immediatamente. Di seguito sono riportate le risorse per aiutarti a segnalare l'incidente e proteggerti.
Segnalalo alle autorità locali
Seleziona il tuo Paese per ottenere contatti ufficiali del crimine informatico o creare una bozza di reclamo →.
Verifica qualsiasi dominio
Analisi delle minacce utilizzando blocklist archiviate, WHOIS, DNS e prove di scansione pubblica
Scansiona oraSegnala un tentativo di phishing
Segnala i domini sospetti al nostro database delle minacce — proteggi la comunità
SegnalaFeed in tempo reale sulle minacce
Segnalazioni recenti di phishing e modifiche osservate della disponibilità
MonitoraRimani informato, rimani al sicuro
Controlla le minacce in tempo reale oppure contesta questa segnalazione se ritieni che si tratti di un falso positivo